Prime on Project Delivery
AIA Imarksweb
AIA Construction doduments list
AIA Documents (Synopses)
AIA Documents (Families)
AIA Contract Documents Diagrams
AREFORUM Ironwarrior
AIA A101 - 1997 Fixed price method = stipulated sum = lump sum
AIA A102 - 2007 Guaranteed maximum price = cost of the work plus a fee
AIA A201 Webinar
AIA A201 - 2007
AIA A201 - 2007 Iron Warrior
lien: "right to hold property of another until debt is paid,"
The role of the Initial Decision Maker
AIA A201 - 2007 Texas
AIA B101 2007
AIA B101 PPT review
AIA B102 - 2007 (Former B141)
AIA B102 - 2007 (Template)
AIA B141 - 2004
AIA A141 - 2004 Exhibit A Design Build
Traditional Method = Design-Bid-Build = Competitive Bidding
Design-build can be ammended by a Change Order G701
AIA G701 - 2001 a Construction Change Directive
AIA G714 or (4) a Design Change Notice (DCN), written order for a minor change in the Work issued by the Owner and signed by both parties.
The Design/Builder shall submit to the Owner, consistent with AIA G702 and G703, an application for each payment, and, if required, receipts or other vouchers showing its payments for materials suitably stored at the construction site and labor, including applications from and payments the Architect, Consultants, Contractor or to Subcontractors.
Design Build
Design Build from the contractors side
Design Build Master
Design Build Module 1
Design Build Module 2
Design Build Module 3
Design Build Module 4
Design Build Module 5
Design Build Module 6
Design Build Module 7
Design Build Module 8
Design Build Module 9
Design Build Module 10
USACE Design Build
USACE Technical Requirements for Design Build
Design Build PPT
MEPcor
The MasterSpec Format
HVAC Systems
Performance Specifications Guide